Bomen NSW · 2020-2023
RIFL Hub
Riverina Intermodal Freight Logistics Hub
Since the RIFL Hub commenced in 2020, ARTL has provided Geotechnical Investigations, Material Conformance Testing, Level 1 Fill Certification, Concrete Testing, Inspections within the Railway Corridor and Specialised Geotechnical Consultancy.

2020-2023Project period
$78.6 millionProject value
Bomen NSWLocation
9 servicesProvided by Aitken Rowe
What we did on this project
Over 700,000 cubic metres of soil was moved during the bulk earthworks at the site; Bomen’s largest earthmoving project to date.
Over 700,000 cubic metres of soil was moved during the bulk earthworks, Bomen's largest earthmoving project to date.
What we provided on this project
- Inspections within the Railway Corridor
- Specialised Geotechnical Consultancy
- Material Conformance Testing
- Level 1 Fill Certification
- Geotechnical Investigations
- Concrete Testing
- Pavement Design
- Bearing Capacity Assessments
- Batter and Slope Stability Assessments