Wagga
|
Griffith
|
Albury

Eunony Bridge Upgrade

Wagga Wagga NSW

Date:
2019-2020
Project value:
$10.6 million

ARTL provided crucial Geotechnical Consultancy and Laboratory Conformance Testing during the closure of upgrade of the Eunony Bridge, as part of the ongoing Wagga Wagga ‘Special Activation Precinct’. Pavement Designs, Bearing Capacity Assessments, Crane Pad Design and Concrete Testing were carried out by ARTL throughout the project duration.

  • Geotechnical Engineering & Pavement Design
  • Commercial & Industrial Drilling Investigations
  • Residential Site Classifications & Effluent Disposal Assessments
  • Soil, Concrete & Aggregate Testing - NATA Accredited Laboratories

DISCUSS YOUR PROJECT

with our experienced Geotechnical Engineers
Wagga Wagga | Griffith | Albury / Wodonga
(02) 6939 5555
Angry Ant Web Design | Matt Beaver Photography
chevron-down